pipe_takeoff merged line ends closer than tol = 1.0 drawing units and
silently dropped any segment shorter than that. On a millimetre P&ID that is
1 mm. On a metre drawing it is a metre: ends a metre apart were merged and
every pipe under a metre disappeared from the totals, with no warning. The
review of the network engine found this.
- tol now defaults to 1 mm in the unit the P&ID's geometry implies: 1.0 on
a millimetre drawing, 0.001 on a metre one. A tol the caller gives is
used as given.
- build_network counts the segments that collapse to a point
(stats.segments_below_tol), and pipe_rows turns a non-zero count into a
warning naming the tolerance.
A new wire test builds a metre P&ID with a 0.6 m pipe and a 5 m pipe. Before
this change the takeoff said 5.0 m; now it says 5.6 m. The network test
checks that a sub-tolerance stub is counted. Registry, packs, aliases and
every track H suite: 472 passed. The inventory matches the live surface.
Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01FKFStjEFzpGyLq5bMpWxTd