Umut CANandClaude Opus 5.5 554daff8d0 feat(understand): room frames, the nearest panel and possible packages — what the field test asked for
The takeoffs were run again on a real P&ID pair (kept outside the repository)
and compared with the hand-made workbooks. The user chose how three gaps
should close:

- Rooms drawn as frames. A room label that no wall face holds takes the
  smallest closed, straight-sided polyline around it, provided it holds no
  other room number and is at least ten label heights a side (label+frame,
  0.8). A P&ID draws its rooms this way, so P&ID lengths are now cut at the
  frames rather than sent to the nearest label. An unnumbered mention inside
  a frame ('hot room') does not deny it.
- The nearest panel, flagged. cable_takeoff(panel_rule="nearest") is the
  default: a load that no callout places takes the nearest panel on the
  layout, among names with a panel prefix (is_panel_name: CP, JB, DB,
  MCC ...) or names a callout gives. The row is flagged panel_inferred, and
  an inferred panel never makes a package. panel_rule="stated" keeps the old
  behaviour. The takeoff_roundtrip gate and the cable correctness check read
  stated panels only: a guess is no evidence.
- Possible packages and detail copies. pipe_takeoff reports detail_copies:
  compact groups of tags drawn twice (repeated), and compact groups of one
  equipment's own parts, such as M150B, M150C and M150D of M150 (family). A
  vendor package or an equipment detail shows up this way. Nothing is
  removed until exclude_regions names a region. The runs left out go to the
  control rows as excluded_region and to excluded_m. The workbook's method
  sheet names the regions.

Each change has a synthetic test that failed first. Suite: 4986 passed, 1
xfailed. The inventory and the document numbers match (README: 4987
collected).

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01FKFStjEFzpGyLq5bMpWxTd
2026-09-24 17:18:18 +03:00
Umut CANandClaude Opus 5.5 459d3b9228 feat(understand): cable_takeoff - one row per load, rounded to the metre
cable_rows reads each load's power, phases, voltage, neutral and VFD from the
P&ID's electrical texts near its tag, and its panel from the layout's wiring
callouts (else the P&ID's), names normalised CP 1 -> CP-1. The length is the
Manhattan distance on the layout from the tag to its panel, and the cable
ROUNDUP(length x (1 + allowance)) to the metre, on the length rounded to
1e-6 m so binary noise never buys a metre. Power is never invented: a load
with no stated kW keeps an empty cell and an open item. Without a layout the
lengths stay empty with an open item per row. Room and panel totals count a
panel package's power once, never its children's as well; the rule is on the
method sheet. Sections only from the caller's section_rules - no standard
table exists here.

The workbook gains the cable shape (Metraj, Ozet by room and panel, Kontrol
as the open-items list, Metodoloji) in the same three languages;
cable_takeoff joins SECTION 27. Inventory regenerated; README snapshot 243
tools (238 advertised); registry snapshot analysis: 14.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01FKFStjEFzpGyLq5bMpWxTd
2026-09-24 12:28:59 +03:00