docs(plan): track H — 12 TDD tasks in three groups
The skeleton's header, constraints, file map and pinned interfaces now carry their twelve tasks, in order: - main (Tasks 1-2): the snapshot, vocabulary and label parsers, MAX_DXF_BYTES 512 MB and the office extra; the synthetic plant pair with its truth. - U (Tasks 3-4): drawing_understand and drawing_scale_check; SECTION 26 opens. - N (Tasks 5-8): the line network, orthogonal lengths and pipe rows, the takeoff workbook with pipe_takeoff, then cable_takeoff; SECTION 27, pack plant. - D (Tasks 9-10): drawing_diff and drawing_topology_check with the three topo_* focuses, on D's own copy of SECTION 26. - final (Tasks 11-12): packs, lean 65, aliases, golden queries and counts; benchmark v7, five correctness checks, the live smoke, the field-test script and the docs. Interface pass: the U and N texts now say what Task 6 really does with the scale check (it takes one through pipe_rows(scale=...) and otherwise keeps its own stand-ins), and Task 11 moves D's block above SECTION 27 after the merge. Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01FKFStjEFzpGyLq5bMpWxTd
This commit is contained in:
co-authored by
Claude Opus 5.5
parent
4cd5603725
commit
023eac7a51